Most of what we do is houses, and most of those houses are within half an hour of our shop in south-east Greensboro. Interior and exterior painting, cabinets, and the drywall repair that almost always turns out to be part of the job.
Preparation decides how long it lasts
A repaint is bought on colour and judged on preparation. Washing off chalk, pollen and mildew, scraping back to a sound edge, replacing trim that has gone soft rather than coating over it, caulking the joints that have opened, and priming bare wood before anything else goes on — that is where the hours go, and it is the difference between a finish that holds for a decade and one that starts letting go in its third summer.
What the Piedmont does to paint
Our summers are hot and humid, our springs coat everything in pine pollen, and our tree cover keeps north and east elevations damp long after the sun is up. South and west walls take the UV and fail years before the rest of the house, which is why so many Triad homes look respectable from the street and tired from the driveway. We plan around all of it: no spraying a hot sunny elevation in mid-afternoon, no late-autumn coats applied into a falling dew point, and no painting over pollen in April because the calendar says it is time.
Older housing needs different handling
Fisher Park, Ardmore, Westerwood, the Oakdale mill village and the older streets of High Point are full of pre-1978 housing. That means lead-safe work practices on anything that disturbs old coatings, plaster rather than drywall behind the trim, and hand preparation on profiles no sander reaches. It is slower. It is also the only way those houses come out right.